Api Power Company Pvt. Ltd was established in B.S. 5th Ashad, 2060 (19th June, 2003) under "The Company Act, 2053". The company was converted into a Public Limited company on B.S. 6th Shrawan 2070 (21st July, 2013). The main objective of the company is to generate electricity through utilization of water and renewable resources abundantly available in the country in solving our everlasting energy crisis. The company has its Corporate Office located at 4th Floor, Trade Tower Nepal, Thapathali, Kathmandu.

2024 All Rights reserved with Rolling Nexus